The Boring PartsFederalLocal · USLocal · Canada

Ballston Spa, NY

Recent Ballston Spa public meeting topics include planning & zoning, roads & infrastructure, housing, development projects, permits & licensing, contracts & procurement.

Topics found in recent meetings

Recent Ballston Spa meeting summaries, agendas, and minutes

Get Ballston Spa meeting alerts

One email when Ballston Spa posts a new agenda or minutes. Free, unsubscribe anytime.

We have no upcoming meetings on file for Ballston Spa. The most recent record we hold is from Fri Aug 28, 2026. Newer meetings may not have been published to the official portal yet, or may not have been collected by us yet — this is a statement about our record, not about whether the board or council has met.
Ballston SpaNY averageUS Census ACS
Population
5,080
Per-capita income
$44,059
Median home value
$281,600
Bachelor's or higher
44%
Typical home value $439,936 +5.5% yr/yr · +31.2% 5-yr
Home-value trend 2000–2026 (Zillow ZHVI)
Jump to meetings ↓
👤 Members & officials (24)
Members seen in recent official meeting records — names and roles as published.
Who’s on the Board of Trustees
Who’s on the Ethics Committee
Who’s on the Historic District Commission
Who’s on the Planning Board
Who’s on the Zoning Advisory Committee

Development activity

Housing units permitted — US Census Building Permits Survey
20252 housing units ($520K)

Recent meetings

Fri Aug 28, 2026

Ethics Committee

Ethics board to review complaint, may vote on enforcement

The Ballston Spa Board of Ethics is meeting to review state ethics and open meeting materials, establish an as-needed meeting protocol, and enter executive session to investigate a specific complaint alleging a violation of the local Code of Ethics. After the closed session, the board may reconvene to vote on enforcement determinations if applicable.

ethicsopen-meeting-lawfreedom-of-informationcomplaintexecutive-session
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Village of Ballston Spa Board of Ethics Meeting Agenda Date: Friday, August 28, 2026 Time: 3:00pm-4:00pm Physical Meeting Location: Ballston Spa Public Library, 21 Milton Avenue, Ballston Spa, NY 12020 I.​ Opening Proceedings: A.​ Call to Order B.​ Roll Call and Quorum Verification C.​ Verification of Public Notice D.​ Election of Board Secretary II.​ Approval of Minutes: A.​ Minutes of The Previous Meeting III.​ New Business: A.​ Distribution and Review of New York State Regulatory Materials 1.​ New York State Open Meeting Law (Link) 2.​ Board of Ethics (Link) 3.​ Open Meeting Law (OML) Frequently Asked Questions (Link) 4.​ NYS Freedom of Information Law (Link) B.​ Establishment of As-Needed Meeting Protocol IV.​ Executive Session (Closed to the Public): A.​ Motion to Enter Executive Session 1.​ Statutory Grounds to Enter Executive Session: a)​ [NYS Public Officers Law § 105(1)(f)]: Discussion of the medical, financial, credit, or employment history of a particular person or corporation, or matters leading to the appointment, employment, promotion, demotion, discipline, suspension, dismissal, or removal of a particular person or corporation. (1)​Purpose: This session is called to review, deliberate, and investigate a specific complaint alleging a violation of the local municipal Code of Ethics. B.​ Motion to Exit Executive Session V.​ Reconvene to Open Session & Formal Action: A.​ Voting on Enforcement Determinations (If applicabl …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

ZBA to review special permit for 168-unit Tannery Commons redevelopment at 125 Bath St

The Ballston Spa Zoning Board of Appeals is reviewing an application from Blue Ridge Cascade for a special use permit to redevelop the former tannery site at 125 Bath Street. The project involves demolishing 5 existing buildings and constructing 3 new buildings with 168+ multifamily dwelling units, plus amenities. The applicant is also seeking an interpretation of zoning ordinance sections and a variance extension, though details on those requests are not provided in the agenda. The board will decide whether to grant the special permit and any related relief.

zoningspecial-permithousingredevelopmentmultifamily
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Page 1 of 8 VILLAGE OF BALLSTON SPA 66 Front St Ballston Spa, NY 12020 Ph: (518)885-5711 Fax: (518)885-0512 APPPLICATION FOR: APPEAL TO THE ZONING BOARD FOR AN INTERPRETATION, USE VARIANCE, AREA VARIANCE AND/OR VARIANCE EXTENSION APPLICANT(S) OWNER(S) (if not applicant) ATTORNEY/AGENT Address _______________________________ _________________________ _____________________ _______________________________ __________________________ ____________________ Phone _____________________/__________ _______________/_____________ __________/__________ Email ________________________________ _____________________________ ____________________ *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Applicant’s interest in the premises: ____ Owner ____ Lessee _____ Under option to lease of purchase PROPERTY INFORMATION 1. Property Address/Location: ______________________________ Tax Parcel No: _____________ 2. Date acquired by current owner: ___________________________________________________ 3. Zoning District when purchased: ___________________________________________________ 5. Current Zoning District: ___________________________________________________________ 6. Has a previous ZBA application/appeal been filed for this property? a. ___ Yes (when? __________, for what? ______________________________________) b. ___ No 7. Is property located …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

ZBA reviews landscaping, lighting, and site details for Ballston Spa Tannery project

The Zoning Board of Appeals is reviewing site plans for the Ballston Spa Tannery project at 125 Bath Street, including landscaping, lighting, and construction details. The agenda consists of technical drawings and specifications rather than formal resolutions or public hearings.

zoninglandscapinglightingsite-planconstructionballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
4 L-7.03 5 L-7.03 4 L-7.03 6 L-7.03 7 L-7.03 BATH STREET (PUBLIC RIGHT-OF-WAY) PROPOSED DECIDUOUS TREE, TYP. PROPOSED EVERGREEN TREE PROPOSED DECIDUOUS TREE, TYP. PROPOSED PERENNIAL, TYP. PROPOSED SHRUB, TYP. 23 PG GROWING VINES ON WALL, TYP. 14 PQ 6 PG 6 PG 3 AG 8 PA 7 AB 5 AB 24 FI 4 NS 2 AS 2 AS 4 HA 8 BA 3 AR 8 AG 8 AG 13 PV 2 AB 12 HA 5 CK 13 PA 13 PA 13 PV 1 AS 3 CK 2 AS 1 AR 1 AR 2 AG 14 CA 2 HA 8 AG 4 AG 6 CA 12 PV 6 AG 11 CA 6 AG 4 PA 4 PA 4 PA 4 BA 4 S 4 BA 4 S 4 BA 12 PV 13 PV 4 BA 4 PA 4 S 4 BA 4 PA 4 S 4 BA 4 PA 4 PV 4 PV 4 PA 2 HA 4 PA 4 PA 4 CA 2 HA 2 PQ 67 RG GRASSES AND PERENNIAL 6 L-7.03 Unauthorized alteration or addition to this document is a violation of Section 7209 of the New York State Education Law. Save Date: 6/16/2026 12:57 PM File Name: G:\Proj-2023\2023024_Ballston_Spa_Tannery\2023024CAD\2024_L-5.0 Landscaping Plan.dwg Plotted By: JESSICA MINK Project Title: Prepared for: Drawing Title Drawing No. Rev: Description: Date: Project No.: Design: Drawn: Date: Scale: Ch'k'd: © the LA Group 2017 Ballston Spa Tannery 125 Bath Street Ballston Spa, NY 12020 2023024 Blue Ridge Cascade Blue Ridge Cascade 2223 112th Ave, NE, Suite 102, Bellevue, WA 98004 LANDSCAPE PLAN L-5.0 MCB MCB DBH 6/17/2026 1"=30' 10 20 30 30 0 Scale: 1" = 30' LEGEND PROPERTY LINE TREE SHRUBS 4 L-7.03 7 L-7.03 PLANT LIST SYM. QTY. BOTANICAL NAME COMMON NAME SIZE REMARKS/SPACING DECIDUOUS TREES AS 7 Acer saccharum Sugar Maple 3"-3 1/2"cal. B&B NS 4 Nyssa sylvatica Black Gum 3"-3 1/2"cal. …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

ZBA to decide if Tannery Commons buildings need height variance

The Zoning Board of Appeals is reviewing whether the three-building Tannery Commons project at 125 Bath Street complies with the village's 50-foot height limit or needs a variance. A structural engineer's review concludes the buildings are designed to stay within the limit, with parapets and chimneys falling under the 5-foot height exception. The board will use this review to decide whether to place the project on its agenda for a variance request.

zoningheight-variancebuilding-permittannery-commonsballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
BI Clerk RR sss sisi From: Serra, Kathryn <K,Serra@ctmale.com> Sent: Wednesday, July 8, 2026 3:42 PM To: BI Clerk Ce: Building Inspector Subject: RE: 125 Bath Street Good afternoon Kathy and Dave. | had our managing architect Nick Lobosco review the renderings vs. the Village Code. Below is his response. It’s lengthy, but is necessary for the record given our findings. Based on my review of the provided documents and applicable code sections it appears the applicant is intentionally designing all three buildings to comply with zoning height restrictions. So i would agree with the village clerk and inspectors comments below. Code Sections: 1. Zoning 205 Attachment 4 Schedule B Area and Bulk Regulations a. District CBD allows max building height of 4 stories and 50 feet. 2. Zoning 205-5 Definitions: a. Building Height - confirms height is based on the mean finished grade to highest point of building or structure. 3. Zoning 205-26 —- Height Exceptions a. Paraphrasing - Height limit can be exceeded no more than 5 feet at non-occupied features such pas parapets or cornices. b. Paraphrasing— i. features should only be erected to such height as is necessary to accomplish their intended purpose. ii. Aggregate coverage shall not occupy more than 10% of the roof area. iii. No signage to be placed on or within the height exception area. Document Review: In review of submitted documents dated June 22, 2026 consisting of plans and elevations (7 pages). The project consists of 3 …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

ZBA to review denied pergola application at 60 Hyde Blvd

The Ballston Spa Zoning Board of Appeals will consider an area variance application from Mila Woodfield to build a pergola at 60 Hyde Blvd. The building permit was denied because the proposed structure would violate rear and side yard setback requirements under Village Code 205-25. The applicant seeks relief from the setback rules to proceed with the project.

zoningvariancepergolasetbacksballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
SETTLED IN 1771 INCORPORATED IN 1807 Village of Ballston Spa 66 FRONT STREET Ballston Spa, NY 12020 518-885-5711 July 29, 2026 To: — Mila Woodfield 60 Hyde Blvd Ballston Spa, NY 12020 Re: Application for building a pergola located at 60 Hyde Blvd., Ballston Spa, NY 12020. Tax ID: 216.25-1-100 Dear Mila, Attached please find your denied application for a pergola on property located at 60 Hyde Blvd., Ballston Spa, NY for the following reasons. Application is out of compliance with Village of Ballston Spa Code 205-25 (A)(2)(a and c) Rear yard: 5 feet from the rear property line and 12 feet from any side lot line. Not closer than 15 feet to a principal building, whether in a rear yard or a side yard. if you wish to apply for a variance for this project, please complete the Zoning Board of Appeals application which can be found on our website (ballstonspa.gov). Sincerely, - Dave LaFountain Code Enforcement Officer Phone: (518)288-4006 Email: buildinginspector@balistonspa.gov Cc: Kevin McDonough Peter Champagne Enclosure ‘YUASE OF RALISTON SPa parE arpucanonmaDe: 7/24/24. BUADING DEPARTMENT PERATT NOBBER- APPLICATION fox BULDING PRAT ISHED, EXPIRES: wi — 7 CONSTRECTION 10 BE BY COMPLLANCE WITH "NEW YORK STATE INFORM FIRE PREVENTION AAD BULDING CODED TULA OF LLSTONSPA TG RE 1, GENERAL INFORMATION POD Sabri Name: a __ Tato Zo. LS ~| - 100. Htre ist: Yes. > Ha Ovnendip: YPrtae Pike 2. APPUCANT Hae Mala Woodfictd praia tad ila sande Cana wm Address mses iy a = —___ …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

ZBA to hear two variance/special permit requests

The Ballston Spa Zoning Board of Appeals will hold an agenda meeting and a business meeting. The board will consider two applications: a variance request for a detached pergola at 60 Hyde Blvd and a special permit for multi-family use at Tannery Commons, 125 Bath Street. The board will also approve minutes from prior meetings.

zoningvariancespecial-permitpergolamulti-familyballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
SETTLED IN 1771 INCORPORATED IN 1807 Village of Ballston Spa 66 FRONT STREET Ballston Spa, NY 12020 518-885-5711 ZONING BOARD of APPEALS AGENDA August 26, 2026 ~ Ballston Spa Elks– 10 Hamilton Street 7:00 P.M. (Agenda Meeting) 1. Call to order – Chair 2. Ascertain quorum 3. Review/ Set agenda 7:15 P.M. (Business Meeting) 1. Pledge of Allegiance 2. Approve meeting minutes of April 29, 2026 and July 29, 2026 3. Old Business: None 4. New Business: Mila Woodfield – 60 Hyde Blvd (SBL # 216.25-1-100) – Applicant is seeking to construct a detached pergola. Application is out of compliance with rear and side setbacks and distance from a principal building. Tannery Commons – Blue Ridge Cascade – 125 Bath Street (SBL # 216.92-1-96.2) – Applicant is seeking a Special Permit to allow multi-family use on all floors of the buildings proposed in the Central Business District. 5. Public Comment 6. Adjourn
Wed Aug 26, 2026

Zoning Board of Appeals

Tannery Commons project at 125 Bath St seeks special use permit and site plan approval

The Zoning Board of Appeals and Planning Board will review an updated proposal for the Tannery Commons project, a 168-unit multifamily residential development at 125 Bath Street. The applicant requests a special use permit from the Zoning Board and site plan approval from the Planning Board. The revised plan now includes demolition of all existing buildings and construction of three new residential buildings, with no commercial use or variances required.

zoninghousingspecial-use-permitsite-planballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
ALBANY | 677 Broadway, 7th Floor ● Albany, NY ● 12207 ● 585.987.2838 BUFFALO | 50 Fountain Plaza, Suite 320 ● Buffalo, NY ● 14202 ● 716.248.3200 ROCHESTER | 1900 Bausch & Lomb Place ● Rochester ● NY 14604 ● 585.987.2800 WOODSOVIATT.COM Writer's Direct Dial Number: 585.987.2905 Writer’s Direct Fax Number: 585.362.4623 Email: bbrugg@woodsoviatt.com August 7, 2026 Zoning Board of Appeals & Planning Board Village of Ballston Spa 66 Front Street Ballston Spa, New York 12020 Re: Proposed Tannery Commons Project 125 Bath Street, Village of Ballston Spa Supplemental Letter of Intent Dear Board Members, As you know, this office represents the Tannery Commons project proposed at 125 Bath Street in the Village of Ballston Spa (the “Project”). This letter is submitted to follow up on our recent submission and update the Boards regarding the pending applications for approvals for the Project, as we anticipate moving forward with the approval process. Applicant Entity Updated As was requested, updated application forms have been submitted to update the applicant entity name, which has changed to reflect restructuring of the partners undertaking the Project and the current contract purchaser. Since submission of the original application, two of the original partners in the Project have merged to form a new entity doing business as Blue Ridge Cascade, which is now the contract purchaser, and NRP Group has joined the Project developer team. Conifer is no lon …
Excerpt truncated on this listing page. Full text →
Wed Aug 26, 2026

Zoning Board of Appeals

Wed Aug 26, 2026

Zoning Board of Appeals

ZBA reviews Tannery Commons site plan for 168-unit development at 125 Bath Street

The Ballston Spa Zoning Board of Appeals is reviewing the Tannery Commons site plan submission for a 168-unit multifamily development on a 6.35-acre brownfield site at 125 Bath Street. The plan includes three buildings (up to 4 stories), 207 parking spaces, and extensive site work. The board is considering the site plan, which includes demolition, grading, drainage, utilities, and landscaping details.

zoningsite-planmultifamily-housingbrownfieldparkingenvironmental
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
COVER SURVEY ALTA/NSPS LAND TITLE SURVEY L-1.0 SITE PREP & DEMOLITION PLAN L-1.1 EROSION & SEDIMENT CONTROL PLAN L-2.0 LAYOUT & MATERIALS PLAN L-3.0 GRADING PLAN L-3.1 DRAINAGE PLAN L-4.0 UTILITIES PLAN L-5.0 LANDSCAPE PLAN L-6.0 LIGHTING PLAN L-7.01 SITE DETAILS L-7.02 SITE DETAILS L-7.03 SITE DETAILS L-7.04 SITE DETAILS L-7.05 SITE DETAILS L-7.06 SITE DETAILS L-7.07 SITE DETAILS Tannery Commons Site Plan Submission SHEET INDEX: PROJECT LOCATION MAP SCALE: N.T.S. PROJECT VICINITY MAP SCALE: N.T.S. SITE / CIVIL: APPLICANT: Blue Ridge Cascade 2223 112th Ave, NE, Suite 102, Bellevue, WA 98004 PROJECT SITE June 17, 2026 TAX PARCEL # 216.32-1-96.2 PARCEL SIZE: 6.35± ACRES ZONING DISTRICT: CENTRAL BUSINESS DISTRICT (CDB) AREA / BULK REQUIREMENTS REQUIRED PROPOSED EXISTING MINIMUM LOT SIZE: 5,000 SF 272,250 SF 272,250 SF MINIMUM LOT WIDTH: 50' 480.95' MAX. BUILDING COVERAGE: 100% ALLOWED 20.8% 22.2% MAX. % IMPERVIOUS SURFACE: 100% 53.2% 70.2% MAX. BUILDING HEIGHT: 50' 50' 28' MAX. BUILDING STORIES 4 4 YARD SETBACKS FRONT: NONE 29' 6.5' REAR: NONE 51.08' 120.3' SIDE: NONE 62.26'(S) 16.9' (N) PARKING MULTIFAMILY DWELLING 1 PER UNIT x 168 UNITS168 SPACES 207 SPACES SITE STATISTICS: BATH ST PROJECT SITE THOMPSONS ST MILTON AVE VAN BUREN ST HAMILTON ST MALTA AVE WASHINGTON ST ARCHITECTS: The Architectural Team, Inc. 50 Commandant's Way as Admirals Hill Chelsea, MA 02150 617-889-4402 BATH ST THOMPSONS ST VAN BUREN ST HAMILTON ST GORDON CREEK HAMILTON STREET BATH STREET (PUBLIC RIG …
Excerpt truncated on this listing page. Full text →
Mon Aug 24, 2026

Board of Trustees

Board to review agreements funding local nonprofits and event permits

The Board of Trustees is reviewing several agreements and requests, including funding contributions to local nonprofit organizations, a library design invoice, a parking lot sealcoating requisition, and special event applications. The agenda includes proposed contracts with the National Bottle Museum, Ballston Area Senior Citizens, and Ballston Area Recreation Commission, as well as a conference registration and event permit requests.

budgetnonprofit-fundingcontractseventslibrarypublic-works
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
AGREEMENT This Agreement is made on the ist day of June, 2026, by and between the VILLAGE OF BALLSTON SPA, a municipal corporation with offices located at 66 Front Street, Ballston Spa, New York, 12020, hereinafter referred to as the "Village" and the NATIONAL BOTTLE MUSEUM, a NY not for profit organization with an address of 76 Milton Avenue, Ballston Spa, NY 12020, hereinafter referred to as “Organization.” WHEREAS, the Village of Ballston Spa is interested in and dedicated to the improvement and enrichment of the quality of life for the citizens of the Village, through the sponsorship of activities provided by the Organization, including but not limited to consulting services, programs for adults and children, house the Village Visitors Center, provide brochures, and keep Village visitor statistic; and WHEREAS, the Village deems it to be in the best interests of the health and welfare of the community to have the activities and services provided by the Organization; and WHEREAS, the Organization would be unable to continue to provide the programming without the financial support of the communities it serves. NOW, THEREFORE, IT IS AGREED, the Village and the Organization specifically agree as follows; 1. Term: The Term of this Agreement shall run from June 1, 2026 to May 31, 2027. 2, Termination: It is further agreed that this Agreement may be terminated by either party upon thirty (30) days' notice, with the amounts to be paid hereunder fo be prorated accordingly. …
Excerpt truncated on this listing page. Full text →
Mon Aug 24, 2026

Board of Trustees

Board approves SLIC fiber and wireless water tower link

The Ballston Spa Board of Trustees approved several motions, including a SLIC Fiber burial drop for Kelley Park and a wireless IP installation at the John Street water tower for telemetry. They also approved sidewalk permits, a fundraiser, and various consent agenda purchases. The meeting included discussion on delinquent water meter readings, parking enforcement, and a fuel tank leak at the DPW garage.

wirelesswatertelemetrysidewalkfundraiserconsent-agendaparkingwater-rates
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Village of Ballston Spa Board of Trustees Meeting Minutes August 10, 2026, 7:00 PM - 8:08 PM Present: Mayor Rossi, Trustee VanDeinse-Perez, Trustee Price-Bush, Trustee DuBuque, Trustee Dunkelbarger, Attorney Buettner, Village Administrator Jennifer Moskowitz, Village Clerk Rebecca Little 1) Call to Order-called to order at 7:00 PM. 2) Pledge to the Flag 3) Minutes Motion to approve the minutes of the July 27, 2026 meeting was made by Trustee Price-Bush and seconded by Trustee DuBuque. Trustee VanDeinse-Perez noted that while she was absent from that meeting, she had reviewed the minutes prior to voting. motion carried 4) Presentations- none 5) Public Comment on Agenda Items Only (3 Minutes per Speaker) Mike Iacolucci 3 Encore Dr-item 7b, specifically regarding the wireless IP installation at the John Street water tower. Mayor Rossi explained that the installation would enable two-way telemetry communication to monitor and control water levels and receive alarms, and that the existing T-Mobile cellular system had proven unreliable for this purpose. 6) Consent Agenda Items for Consideration Motion to approve all consent agenda items was made by Trustee VanDeinse-Perez and seconded by Trustee Dunkelbarger. motion carried The following items were approved: i) Authorization for DPW to order from Slack Chemical $4,455.24 worth of chemicals and caps. ii) Authorization for payment to Curtis Lumber for supplies to complete repairs on Tedisco Trail for a tota …
Excerpt truncated on this listing page. Full text →
Mon Aug 24, 2026

Board of Trustees

Board to review $388K in vouchers, including $182K prior-year debt payments

The Ballston Spa Board of Trustees is reviewing a list of audited vouchers totaling $388,130.95 across general, sewer, and library funds for the period 8/11/2026 to 8/24/2026. The agenda is primarily a routine approval of payments, including debt service, vendor contracts, and operational expenses. Notable items include a $182,617.28 prior-year voucher batch with bond payments and a $9,525 attorney bill.

budgetvouchersdebt-serviceparkspolicelibrary
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Run: 8/21/2026 at 12:26 PM Village of Ballston Spa AIP Distribution Summary by Fund from 8/11/2026 to 8/24/2026 Page: 1 “Th ic fe 2, District AA - General 000 AA Fund Total GG - Sewer 000 GG Fund Total LL - Library 000 Li Fund Totai Grand Total Amount 374,608.47 374,609.47 11,709.36 11,709.36 2,812.12 2,812.12 388,130.95 Run: 8/21/2026 at 12:07 PM . Page: 1 ae Village of Bailston Spa ; Abstract of Audited Vouchers: from: 8/11/2026 to..8/24/2026 Claimant Voucher # Invoice Date invoice Distribution Acct Account AIP Owed Chk # Chk Date Description Description Voucher Type: <none> Cummins Saies & Service 44084 712142026 V9-260750780 AA.3410.400.000 Fire Chiefs CE - Contracts 2,150.28 1225998 8/12/2026 Maintenance Service 2004 Vehicle - Approved BOT 8/10/26 Cummins Sales & Service Total 2,150.28 Total for Voucher Type: <none> 2,150.28 Voucher Type: Prepaid A Champagne Builders LLC 44182 8/14/2026 348 AA.7110.400.000 PARKS - Wiswall & Iron Spring CE 8,000.00 1226025 8/21/2026 Tedesco Trail repair (approved BOT) ~ Contr A. Champagne Builders LLC Total 8,000.00 Anthem Biue Cross 14110 8/01/2026 0202608204980 AA.2089.800.000 Other EB (Sect. 125) EB 12,061.98 4226009 8/14/2026 Sept 2026 Anthem Blue Cross Total 12,061.98 De Lage Landen Financiai Svce 44107 5/07/2026 597052268 LL.7410.400.000 Library CE - Contracts 145.00 1226010 8/14/2026 May 2026-PRIOR YEAR 6/07/2026 597404417 LL.7440.400.000 Library CE - Contracts 145.00 1226010 8/14/2026 June 2026 7107/2026 597754334 …
Excerpt truncated on this listing page. Full text →
Mon Aug 24, 2026

Board of Trustees

Trustees to review $1,500 sealcoating contract for fire department

The Ballston Spa Board of Trustees is reviewing a requisition for sealcoating services at the village fire department. Blue Line Sealcoating LLC proposes to sealcoat 8,000 square feet at $0.18 per square foot, totaling $1,500. The agenda is otherwise limited to this single purchasing item.

contractsfire-departmentfacilitiesbudget
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
VILLAGE OF BALLSTON SPA REQUISITION VENDOR NAME ORDERED DATE REQ # Clue LN Seat Cocting Lhe O¥//0/ Jor6 DEPARTMENT. REQUESTED BY INITIALS Eagle Statt lee PYC Co. Vo #L cates He show KE? FUND # SUBMITTED DATE PHONE Building Cline #267) O/"1JoxE SIK-72-8-S 174 Qty Unit Stock Item Description Cost/ Estimated Subtotal Number \ — = PCAN Contin A / 500-6 Be hp Soir. 0m Total Cost x hs 50. v0) NOTES DATE APPROVED APPROVED BY: AMOUNT APPROVED: Spa Fire Department igton St Ballston Spa NY 12020 _ BLUE LINE SEALCOATING LLC ss) «IGS HOESVILLE RD ELINl= — BROADALBIN NY 12025 SEALCOATING LLG (A ormcoasner } _ (518) 866-6615 Bren, 518-866-6615 sete FREE ESTIMATES FULLY INSURED SERVICE DESCRIPTION RATE AMOUNT SEALCOAT ~ 8,000 $Q FT $0.18, /SQ) eT $1,5 00 Subtotal $1,500 *Tax Rate 0% *Tax $0 *Tax Exempt Documentation Must Be Provided
Mon Aug 24, 2026

Board of Trustees

Board approves $37,500 in contracts and annual agreements for local organizations and services

The Village of Ballston Spa Board of Trustees will vote on a consent agenda authorizing payments totaling approximately $37,500 to local entities, including the National Bottle Museum, Ballston Area Senior Citizens, and Ballston Area Recreation Commission. The board will also approve street closures for a September 19 Oktoberfest block party on Washington Street and a 9/11 Memorial Ceremony on Front Street. Additionally, the board will appoint Adam Zeilman as a part-time police officer and continue discussions on a Zoning Code Update.

budgetpolicezoningcommunity-eventspublic-safety
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
1 AGENDA Board Meeting Village of Ballston Spa August 24, 2026 Zoom Log in ID: 88902961300 Password: 380778 1) Call to Order 2) Pledge to the Flag 3) Motion made by Trustee__________, seconded by Trustee___________ to approve the August 10, 2026 meeting minutes. 4) Presentations 5) Public Comment on Agenda Items Only (3 Minutes per Speaker) 6) Consent Agenda Items for Consideration a) Motion made by Trustee____________, seconded by Trustee____________ to approve the following items: i) authorization to pay the Butler Rowland Mays invoice for $1200.00 for conceptual renderings of an Outdoor reading garden. (paid for by SALS grant money) ii) authorization to utilize Blue Line Sealcoating $1,200.00 for Eagle Matt-Lee Fire Company parking lot and apron. iii) authorization for the payout of $2750.00 to the National Bottle Museum, and authorization for the Mayor to execute their annual agreement. iv) authorization for the payout of $12,500.00 to the Ballston Area Senior Citizens, and authorization for the Mayor to execute their annual agreement. v) authorization the payout of $12,100 to Ballston Area Recreation Commission, and authorization for the Mayor to execute their annual agreement. vi) authorization for the Village Clerk, Village Treasurer, and Village Administrator to attend NYCOM Fall training on September 14-17th being held in Saratoga for $575/pp for full conference. vii) authorize to utilize CQC LLC for $4175.00 for exterior painting at Eagle …
Excerpt truncated on this listing page. Full text →
Tue Aug 18, 2026

Park & Tree Board

Park & Tree Board to review tree grant progress and Milton Ave trees

The Park and Tree Board is meeting to discuss the progress of a tree grant, the B Spain Bloom, and trees on Milton Ave. The agenda includes public comment and planning for the next meeting.

treesparksgrantspublic-comment
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Park and Tree Agenda 8/18/26 Public comment (5 min each) Tree Grant progress B Spain Bloom Milton Ave trees Next meeting Tuesday September 15
Wed Aug 12, 2026

Planning Board

Planning Board to review stormwater plan for Tannery Commons redevelopment

The Ballston Spa Planning Board is reviewing a Stormwater Pollution Prevention Plan (SWPPP) for the Tannery Commons redevelopment project on Bath Street. The plan, prepared for owner Blue Ridge Cascade, Inc., outlines erosion and sediment controls during construction and post-construction stormwater management. The project includes new residential structures, a playground, parking, and drive lanes, with runoff flowing to Gordon Creek.

stormwaterplanning-boardredevelopmentenvironmental-reviewconstruction
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Stormwater Pollution Prevention Plan Prepared in accordance with NYS DEC General Permit GP-0-25-001 for: Tannery Commons Owner/Operator(s): Blue Ridge Cascade, Inc., 2223 112th Avenue NE, Suite 102 Bellevue, Washington 98004 SWPPP Contact(s): The LA Group, PC 40 Long Alley Saratoga Springs, NY 12866 1-518-587-8100 1-518-587-0180 SWPPP Preparation Date: June 15, 2026 Stormwater Pollution Prevention Plan Ballston Spa Tannery 2023024 Table of Contents 1.0 PERMIT OVERVIEW AND REQUIREMENTS ..................................................................... 4 1.1 PERMIT OVERVIEW ................................................................................................................................... 4 2.0 SWPPP REVIEW, UPDATE ....................................................................................................... 5 2.1 SWPPP REVIEW ....................................................................................................................................... 5 2.2 SWPPP UPDATE ....................................................................................................................................... 5 3.0 SITE ASSESSMENT, EVALUATION AND PLANNING ....................................................... 6 3.1 PROJECT LOCATION .................................................................................................................................. 6 3.2 PRE-DEVELO …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board reviews Tannery site landscaping, lighting, and construction details

The Ballston Spa Planning Board is reviewing site plans for the Tannery project at 125 Bath Street, including a detailed landscaping plan, lighting plan, and construction details for sidewalks, curbs, pavement, and erosion control. The agenda consists of technical drawings and specifications, with no separate narrative items or public hearings listed.

planning-boardsite-planlandscapinglightingconstructionerosion-controltannery
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
4 L-7.03 5 L-7.03 4 L-7.03 6 L-7.03 7 L-7.03 BATH STREET (PUBLIC RIGHT-OF-WAY) PROPOSED DECIDUOUS TREE, TYP. PROPOSED EVERGREEN TREE PROPOSED DECIDUOUS TREE, TYP. PROPOSED PERENNIAL, TYP. PROPOSED SHRUB, TYP. 23 PG GROWING VINES ON WALL, TYP. 14 PQ 6 PG 6 PG 3 AG 8 PA 7 AB 5 AB 24 FI 4 NS 2 AS 2 AS 4 HA 8 BA 3 AR 8 AG 8 AG 13 PV 2 AB 12 HA 5 CK 13 PA 13 PA 13 PV 1 AS 3 CK 2 AS 1 AR 1 AR 2 AG 14 CA 2 HA 8 AG 4 AG 6 CA 12 PV 6 AG 11 CA 6 AG 4 PA 4 PA 4 PA 4 BA 4 S 4 BA 4 S 4 BA 12 PV 13 PV 4 BA 4 PA 4 S 4 BA 4 PA 4 S 4 BA 4 PA 4 PV 4 PV 4 PA 2 HA 4 PA 4 PA 4 CA 2 HA 2 PQ 67 RG GRASSES AND PERENNIAL 6 L-7.03 Unauthorized alteration or addition to this document is a violation of Section 7209 of the New York State Education Law. Save Date: 6/16/2026 12:57 PM File Name: G:\Proj-2023\2023024_Ballston_Spa_Tannery\2023024CAD\2024_L-5.0 Landscaping Plan.dwg Plotted By: JESSICA MINK Project Title: Prepared for: Drawing Title Drawing No. Rev: Description: Date: Project No.: Design: Drawn: Date: Scale: Ch'k'd: © the LA Group 2017 Ballston Spa Tannery 125 Bath Street Ballston Spa, NY 12020 2023024 Blue Ridge Cascade Blue Ridge Cascade 2223 112th Ave, NE, Suite 102, Bellevue, WA 98004 LANDSCAPE PLAN L-5.0 MCB MCB DBH 6/17/2026 1"=30' 10 20 30 30 0 Scale: 1" = 30' LEGEND PROPERTY LINE TREE SHRUBS 4 L-7.03 7 L-7.03 PLANT LIST SYM. QTY. BOTANICAL NAME COMMON NAME SIZE REMARKS/SPACING DECIDUOUS TREES AS 7 Acer saccharum Sugar Maple 3"-3 1/2"cal. B&B NS 4 Nyssa sylvatica Black Gum 3"-3 1/2"cal. …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board reviews 125 Bath St proposal: 168 units in 3 buildings

The Ballston Spa Planning Board is reviewing architectural drawings for a proposed development at 125 Bath Street. The plans show three buildings with a total of 168 residential units, including 1-, 2-, and 3-bedroom apartments, plus 45 covered parking spaces and amenity/admin space. The agenda consists solely of these building elevations and sections; no other items are listed.

planning-boardresidential-developmentzoningarchitectureballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
3/28/2025 1:59:40 PM psonCXDSY .rvt C:\_Revit Local 2025\22034 - R25 - Bath St - Central_ethom TYPICAL FLOOR BUILDING 1 GROUND FLOOR BUILDING PROGRAM - 3 STORIES - 41 RESIDENTIAL UNITS - NO COMMON AMENITY 1BR 19 2BR 16 3BR 6 Total 41 0’ 5' 10' 25' 50" 100" © The Architectural Team, Inc. 50 Commandant's Way at Admiral's Hill Chelsea MA 02150 0 617.889.4402 F 617.884.4329 architecturalteam.com Consultant: Revision: Architect of Record: Drawn: ET Checked: EP Scale: Per Graphic Scale Key Plan: 70 BATH STREET N Project Name: VILLAGE OF BALLSTON SPA 125 BATH STREET BALLSTON SPA, NY 12020 Sheet Name: BUILDING 1 EXTERIOR ELEVATIONS Project Number: 22034 Issue Date: June 22, 2026 Sheet Number: A2.01 3/28/2025 2:00:05 PM C:\_Revit Local 2025\22034 - R25 - Bath St - Central_ethom psonCXDSY.rvt = il {Airs cam i C/ BUILDING 2 L er ait) lbs BUILDING PROGRAM - 4 STORY - 60 RESIDENTIAL UNITS - 45 COVERED PARKING SPACES 1BR 22 2BR 26 3BR 12 Total 60 o' 5' 10' 25' 50° 100' © The Architectural Team, Inc. 50 Commandant's Way at Admiral's Hill Chelsea MA 02150 0 617.889.4402 F 617.884.4329 architecturalteam.com Consultant: Revision: Architect of Record: Drawn: ET Checked: EP Scale: Per Graphic Scale Key Plan: Sy Ne ae = » iH AD pees | | a BATH STREET Project Name: VILLAGE OF BALLSTON SPA 125 BATH STREET BALLSTON SPA, NY 12020 Sheet Name: BUILDING 2 EXTERIOR ELEVATIONS Project Number: 22034 Issue Date: June 22, 2026 Sheet Number: A2.02 …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board reviews Tannery Commons site plan for 168-unit development

The Ballston Spa Planning Board is reviewing the Tannery Commons site plan submission for a 168-unit multifamily residential development at 125 Bath Street. The proposal includes three buildings (41, 60, and 67 units), 207 parking spaces, and site improvements. The board will consider the plan's compliance with zoning and environmental requirements, including brownfield site management.

planning-boardsite-planmultifamily-housingbrownfieldzoningparking
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
COVER SURVEY ALTA/NSPS LAND TITLE SURVEY L-1.0 SITE PREP & DEMOLITION PLAN L-1.1 EROSION & SEDIMENT CONTROL PLAN L-2.0 LAYOUT & MATERIALS PLAN L-3.0 GRADING PLAN L-3.1 DRAINAGE PLAN L-4.0 UTILITIES PLAN L-5.0 LANDSCAPE PLAN L-6.0 LIGHTING PLAN L-7.01 SITE DETAILS L-7.02 SITE DETAILS L-7.03 SITE DETAILS L-7.04 SITE DETAILS L-7.05 SITE DETAILS L-7.06 SITE DETAILS L-7.07 SITE DETAILS Tannery Commons Site Plan Submission SHEET INDEX: PROJECT LOCATION MAP SCALE: N.T.S. PROJECT VICINITY MAP SCALE: N.T.S. SITE / CIVIL: APPLICANT: Blue Ridge Cascade 2223 112th Ave, NE, Suite 102, Bellevue, WA 98004 PROJECT SITE June 17, 2026 TAX PARCEL # 216.32-1-96.2 PARCEL SIZE: 6.35± ACRES ZONING DISTRICT: CENTRAL BUSINESS DISTRICT (CDB) AREA / BULK REQUIREMENTS REQUIRED PROPOSED EXISTING MINIMUM LOT SIZE: 5,000 SF 272,250 SF 272,250 SF MINIMUM LOT WIDTH: 50' 480.95' MAX. BUILDING COVERAGE: 100% ALLOWED 20.8% 22.2% MAX. % IMPERVIOUS SURFACE: 100% 53.2% 70.2% MAX. BUILDING HEIGHT: 50' 50' 28' MAX. BUILDING STORIES 4 4 YARD SETBACKS FRONT: NONE 29' 6.5' REAR: NONE 51.08' 120.3' SIDE: NONE 62.26'(S) 16.9' (N) PARKING MULTIFAMILY DWELLING 1 PER UNIT x 168 UNITS168 SPACES 207 SPACES SITE STATISTICS: BATH ST PROJECT SITE THOMPSONS ST MILTON AVE VAN BUREN ST HAMILTON ST MALTA AVE WASHINGTON ST ARCHITECTS: The Architectural Team, Inc. 50 Commandant's Way as Admirals Hill Chelsea, MA 02150 617-889-4402 BATH ST THOMPSONS ST VAN BUREN ST HAMILTON ST GORDON CREEK HAMILTON STREET BATH STREET (PUBLIC RIG …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board to review redevelopment application for 125 Bath Street

The Ballston Spa Planning Board is considering an application submitted by SRI-BLUERIDGE PACIFIC, LLC d/b/a Blue Ridge Cascade LLC and NRP Group, LLC to redevelop the property at 125 Bath Street. The agenda includes an owner authorization letter, indicating the board will discuss or decide on the proposed redevelopment.

planning-boardredevelopmentpropertyballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
May 6, 2026 To the Village of Ballston Spa The undersigned, as the owner of the property at 125 Bath Street in Ballston Spa, hereby authorizes SRI-BLUERIDGE PACIFIC, LLC d/b/a Blue Ridge Cascade LLC and NRP Group, LLC and their affiliates, agents and/or consultants to submit and prosecute applications, and to secure the governmental approvals required for their proposed redevelopment of the property at 125 Bath Street. If you have any questions, please contact me. Sincerely, JJB (eo owner By: ; As: A SnLé Memnerd af Sie fee Contact information: 17 Sonja Lane Ballston Spa NY 12020 (9845561: }
Wed Aug 12, 2026

Planning Board

Planning Board reviews floodplain impact letter for new building in 100-yr flood zone

The Planning Board is reviewing a floodplain impact assessment letter from The Flood Risk Group regarding a proposed project in Ballston Spa. The letter, addressed to The LA GROUP, states that one new building will be located in the 100-year and 500-year flood zones, but no development will occur in the established floodway along Gordon Creek. The assessment concludes the project will not adversely impact flood conditions or alter flood flow patterns.

planning-boardfloodplainflood-zoneenvironmental-reviewdevelopment
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Main Office: Phone: 518-522-0273 236 Van Aernem Road Email: alton@floodriskgroup.com Ballston Spa, NY 12020 May 11, 2026 Douglas Heller, PE Principal, Civil Engineer The LA GROUP 40 Long Alley Saratoga Springs, NY 12866 RE: Full EAF Floodplain impact assessment Doug, As an accompaniment to Part 2, Environmental Assessment Form regarding Section 5, an additional assessment of potential impacts of the project on flood conditions has been completed. This letter is an update to the March 2025 correspondence and is based on the most recent site plan The project , located on the Flood Insurance Rate Map (FIRM) panel FM36091C0438, proposes to have one new building located in the 1% annual exceedance interval ( 100 yr flood zone) and the 0.2% annual exceedance interval (500 yr Flood zone). While the project site does have an established floodway along Gordon Creek, no existing or proposed development will be located in that area. The proposed project is adjacent to the flood flow and located on the upstream edge of the flood zone. The development will maintain any existing drainage paths and the placement of fill will not have any adverse impact to flood conditions or alter flood flow patterns during a 1% storm event of greater. Please let me know if you have any additional questions Thank you Alton Knapp III, CFM The Flood Risk Group, LLC
Wed Aug 12, 2026

Planning Board

Planning Board to review traffic study for 168-unit Tannery Commons apartments at 125 Bath Street

The Planning Board is reviewing a supplemental traffic study for the Tannery Commons residential development, which changed from mixed-use to 168 apartments only. The study shows the new configuration generates fewer trips than the original plan and that traffic impacts are minimal, with no road improvements needed. The board will consider this analysis in its site plan review.

planning-boardtraffic-studyresidential-developmentsite-planballston-spa
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Over 60 offices throughout the United States www.gpinet.com An Equal Opportunity Employer June 12, 2026 Mr. Jeremy Wilkening SRI-Blueridge Pacific, LLC d/b/a Blue Ridge Cascade 2223 112th Avenue NE, Suite 102 Bellevue, WA 98004 Re: Traffic Study Comment Response and Supplemental Analysis Tannery Commons – 125 Bath Street Village of Ballston Spa, New York Dear Jeremy, As you know, Tannery Commons is a proposed residential development located at 125 Bath Street in the Village of Ballston Spa, NY. This site was previously proposed to be mixed-use, with apartments, retail and office space, but that concept has recently changed to residential only. In February 2025, GPI prepared a Traffic Impact Study for the site under its previous mixed-use configuration. This study was reviewed on behalf of the Village by Creighton Manning (CM), who provided traffic-related comments in a memorandum dated June 30, 2025. This memo also incorporated comments made by CM in a 6/10/25 preliminary review. For reference, the development information for the previous configuration (assumed in the 2025 traffic impact study) and the current configuration are as follows: Site Data Previous Configuration Current Configuration No. of Apartments Retail Space Leasable Office Space Parking Spaces 168 units 7,650 Square Feet 3,600 Square Feet 205 Spaces 168 units None None 207 Spaces This letter provides supplemental analysis to update the trip generation potential o …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board to review 168-unit Tannery Commons redevelopment

The Ballston Spa Planning Board is reviewing a site plan application for the Tannery Commons project at 125 Bath Street. The proposal includes demolishing existing buildings on the former tannery site and constructing three new buildings with 168+ multifamily units, amenities, and covered parking. The board will consider the application under the village's site plan review process, which may involve expert consultation and escrow fees.

planning-boardsite-plan-reviewhousingredevelopmenttannery-commons
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
SETTLED IN 1771 INCORPORATED IN 1807 Page 1 of 2 Village of Ballston Spa Planning Board ____________________________ 66 FRONT STREET Ballston Spa, NY 12020 518-885-5711 ** Application Checklist – All submissions must include completed application checklist and all required items. ** Project Name: ____________________________________________________________________ Property Address/Location: __________________________________________________________ Tax Parcel # _______________________________ Zoning District __________________________ (For example: 165.52-4-37) Narrative Summary of Project (use attachment): Date special use permit granted (if any): ______________________________ Date zoning variance granted (if any): _______________________________ Is property located within (check all that apply): □Historic District □ 500’ of a Village boundary, or County/State Highway Applicant(s)** Owner(s) [if not applicant] Attorney/Agent Name ______________________________________ __________________________________________ _________________________ Address ____________________________________ __________________________________________ _________________________ ____________________________________ __________________________________________ _________________________ Phone _____________________________________ __________________________________________ _________________________ Email _____________________________________ __________________________________________ _ …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board reviews water/sewer report for 168-unit Tannery Commons apartments

The Planning Board is reviewing an engineering report for the proposed Tannery Commons development, which would build three apartment buildings with 168 units on Bath Street. The report covers water and sewer connections, projected flows, and fire flow adequacy. The board is deciding whether to approve the project's utility plans.

planning-boardwatersewerhousingdevelopment
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Engineering Report Water and Sanitary Sewer For Tannery Commons BATH STREET BALLSTON SPA, NEW YORK Prepared For Blue Ridge Cascade, Inc., 2223 112th Avenue NE, Suite 102 Bellevue, Washington 98004 Contact: Jeremy Wilkening Prepared By The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 June 17, 2026 Engineering Report Tannery Commons Tannery Commons, LLC 2023024 1 I. Introduction The proposed project consists of the construction of three (3) apartment buildings on the west side of Bath Street, north of Gordon Creek. The site is currently occupied by a vacant former tannery building, which was most recently used as a commercial laundry facility until ceasing operations in 2011. Potable water and fire protection services will be provided through a new 6-inch water service lateral connected to the Village of Ballston Spa water main located within Bath Street. Sanitary sewer service will be provided through two new service connections to the existing Village of Ballston Spa sanitary sewer mains in Bath Street. II. Project Description The project proposes the construction of three (3) apartment buildings with associated access drives, parking areas, landscaping and stormwater management. The buildings have a total of 168 residential units. III. Existing Water and Sanitary Sewer Utilities Municipal water service to the project site is provided by the Village of Bal …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board outlines review process for development applications

This agenda is a procedural guide describing how the Ballston Spa Planning Board reviews significant development proposals. It outlines guiding principles, review categories, and public participation expectations, but contains no specific project decisions or discussions.

planning-boarddevelopment-reviewprocedural
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Village of Ballston Spa Planning Board Purpose The Village of Ballston Spa has established a long-term vision through its Comprehensive Plan, Brownfield Opportunity Area (BOA) Plan, Zoning Code, and other adopted planning documents. The Planning Board reviews development proposals in a manner consistent with those policies while ensuring compliance with applicable laws and regulations. For significant development projects, the Board strives to conduct reviews that are organized, transparent, collaborative, and focused on creating projects that strengthen the Village. This guide describes the Board's general approach to reviewing significant development applications. It is not intended to modify or replace procedures established by the Village Code or New York State law. Guiding Principles • Conduct reviews that are thorough, organized, and transparent. • Provide applicants with a predictable review process and clear expectations. • Encourage meaningful participation by every Planning Board member. • Encourage constructive dialogue among the applicant, Village staff, consultants, involved agencies, and the public. • Focus discussions on opportunities to improve projects whenever practical. • Base decisions on the Village Code, Comprehensive Plan, BOA Plan, engineering standards, and other adopted planning documents. • Maintain a clear administrative record supporting Board decisions. • Balance private investment with the long-term interests of …
Excerpt truncated on this listing page. Full text →
Wed Aug 12, 2026

Planning Board

Planning Board to continue review of Tannery Commons redevelopment

The Ballston Spa Planning Board is meeting to continue the site plan review for the Tannery Commons project, a proposed redevelopment of vacant industrial property at 125 Bath Street into a multi-family community. The agenda also includes approval of previous meeting minutes and a public comment period. No new business is listed.

planning-boardsite-plan-reviewredevelopmentmulti-family-housingpublic-comment
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
SETTLED IN 1771 INCORPORATED IN 1807 Village of Ballston Spa 66 FRONT STREET Ballston Spa, NY 12020 518-885-5711 PLANNING BOARD MEETING AGENDA August 12, 2026 ~ Ballston Spa Elks Lodge - 10 Hamilton Street 6:30 P.M. (Agenda Meeting) 1. Call to order – Chair, Scott Burlingame 2. Ascertain quorum 3. Review/ Set agenda 6:45 P.M. (Business Meeting) 1. Pledge of Allegiance 2. Approve meeting minutes of April 8, 2026 3. Old Business Tannery Commons Project – 125 Bath Street (Tax ID#216.32-1-96.2) Applicant – Tannery Commons, LLC - Applicant is seeking approval for a redevelopment of vacant industrial property into a multi-family community. Applicant is requesting continuation of Site Plan Review. 4. Public Comment – 2 minute time limit per person 5. New Business – None 6. Adjourn
Wed Aug 12, 2026

Planning Board

Planning Board reviews 168-unit affordable housing project at former tannery

The Ballston Spa Planning Board is reviewing a Full Environmental Assessment Form for the Tannery Commons project, a proposed redevelopment of the former tannery brownfield site at 125 Bath St. The project would demolish existing vacant buildings and construct three new buildings with 168 residential apartments, described as affordable housing. The board is considering the project's environmental impacts and required approvals, including site plan approval and zoning variances.

planning-boardhousingbrownfieldenvironmental-reviewzoning
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
FEAF 2019 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Project Location (describe, and attach a general location map): Brief Description of …
Excerpt truncated on this listing page. Full text →
Mon Aug 10, 2026

Board of Trustees

Board to review $99,071.65 in vouchers for village operations

The Ballston Spa Board of Trustees is reviewing a list of audited vouchers totaling $99,071.65 for the period from July 28 to August 10, 2026. The agenda consists solely of the accounts payable distribution summary and the abstract of audited vouchers, with no other business items listed. The board will likely approve these payments, which cover routine expenses such as utilities, supplies, and services.

budgetfinanceutilitiesinsurancepublic-safety
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
Rani. 8/07/2026 at 8:50 AM Village of Ballston Spa A/P Distribution Summary by Fund from 7/28/2026 to 8/10/2026 Page: 7 Fund District AA - General 000 AA Fund Total GG - Sewer 000 GG Fund Total LL ~ Library 000 LL Fund Total TA - Trust & Agency 000 TA Fund Total Grand Total Amount 95,726.80 95,726.80 509.11 509.11 2,200.09 2,200.09 635.65 635.65 99,071.65 6/17/26-7/21/26 National Grid #07102-11117 Total - Contr 93.50 Ron: 8/07/2026 at 8:54 AM . Page: 1 fees Village of Ballston Spa Abstract of Audited Vouchers from 7/28/2026 to 8/10/2026 Claimant Voucher # Invoice Date Invoice Distribution Acct Account AIP Owed = Chk# Chk Date Description Description Voucher Type: Prepaid County Waste - Clifton Park 14061 8/01/2026 35996594W910 LL.7410.400.000 Library CE - Contracts 29.50 Library Service - 7/1/26-7/31/26 8/01/2026 35996650W910 AA.1640.400.000 Central Garage CE - Contracts 281,94 Garage, Union Fire, EML Service - 7/1/26-7/31/26 8/01/2026 35996650W910 AA.3412,400,000 Union Fire Dept CE - Contracts 76.88 Garage, Union Fire, EML Service - 7/1/26-7/31/26 8/01/2026 35996650W910 AA.3411.400.000 E.M.L, Fire Dept CE - Contracts 69.30 Garage, Union Fire, EML Service - 7/1/26-7/31/26 County Waste - Clifton Park Total 457,59 Equitable- Axa 14014 7108/2026 20260730 TA.0020.000.000 Group Insurance 635.65 1225933 7/31/2026 Equitable- Axa Total 635.65 National Grid #00302-11100 13988 7/22/2026 20260729 AA.3411,400.000 E.M.L. Fire Dept CE - Contracts 83.40 1225934 7/31/202 …
Excerpt truncated on this listing page. Full text →
Mon Aug 10, 2026

Board of Trustees

Ballston Spa trustees to vote on sidewalk reimbursement, fiber internet, and multiple purchases

The Ballston Spa Board of Trustees will consider a consent agenda with several routine purchases and payments, plus individual motions for a sidewalk repair reimbursement, fiber internet installation for parks and the water tower, a fundraiser street closure, and sidewalk permits for an art fair. The meeting includes public comment periods and standard procedural items.

budgetpublic-safetyparksinternetsidewalkfundraiserpermits
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
1 AGENDA Board Meeting Village of Ballston Spa August 10, 2026 Zoom Log in ID: 88902961300 Password: 380778 1) Call to Order 2) Pledge to the Flag 3) Minutes 4) Presentations 5) Public Comment on Agenda Items Only (3 Minutes per Speaker) 6) Consent Agenda Items for Consideration a) Motion made by Trustee____________, seconded by Trustee____________ to approve the following items: i) authorization of DPW to order from Slack Chemical $4,455.24 worth of chemicals and caps. ii) authorization for payment to Curtis Lumber for supplies to complete repairs on Tedisco Trail for a total of $4,592.06. iii) authorization of DPW to order from F.W. Webb $1,190.00 in gate, restraint and bolt pak items. iv) authorization for payment of $1,651.56 to TSG Apparel for shirts for the “Swimming Under the Stars” event. v) authorization for the Police Department to order from Earlepress $1,239.00 worth of new ticket books. vi) authorization for the Police Department to purchase from Stryker 2 Defibrillators and 1 wall mount (1 for the Police Department Building and 1 for a patrol vehicle) for $4,011.27. vii) authorization for Union Fire Company to engage Cummins Sales and Service to repair an oil leak and hoses on Trucks 14-3 and 14-2 for a cost of $2,150.28. viii) authorization of DPW to order from Pallette Stone Corp. $1,370.00 worth of frame and grate. 7) Motions/Resolutions for Consideration/Vote a) Motion made by Trustee ______________, seconded by Trustee _________ …
Excerpt truncated on this listing page. Full text →
📄 From the minutes
Extracted text of the official minutes document (automated extraction — may contain OCR/formatting errors).
Village of Ballston Spa Board of Trustees Meeting Minutes August 10, 2026, 7:00 PM - 8:08 PM Present: Mayor Rossi, Trustee VanDeinse-Perez, Trustee Price-Bush, Trustee DuBuque, Trustee Dunkelbarger, Attorney Jordyn Conway, esq., Village Administrator Jennifer Moskowitz, Village Clerk Rebecca Little 1) Call to Order-called to order at 7:00 PM. 2) Pledge to the Flag 3) Minutes Motion to approve the minutes of the July 27, 2026 meeting was made by Trustee Price-Bush and seconded by Trustee DuBuque. Trustee VanDeinse-Perez noted that while she was absent from that meeting, she had reviewed the minutes prior to voting. motion carried 4) Presentations- none 5) Public Comment on Agenda Items Only (3 Minutes per Speaker) Mike Iacolucci 3 Encore Dr-item 7b, specifically regarding the wireless IP installation at the John Street water tower. Mayor Rossi explained that the installation would enable two-way telemetry communication to monitor and control water levels and receive alarms, and that the existing T-Mobile cellular system had proven unreliable for this purpose. 6) Consent Agenda Items for Consideration Motion to approve all consent agenda items was made by Trustee VanDeinse-Perez and seconded by Trustee Dunkelbarger. motion carried The following items were approved: i) Authorization for DPW to order from Slack Chemical $4,455.24 worth of chemicals and caps. ii) Authorization for payment to Curtis Lumber for supplies to complete repairs on Tedisco Trail …
Excerpt truncated on this listing page. Full text →
Mon Aug 10, 2026

Board of Trustees

No agenda available for Ballston Spa board meeting

The Ballston Spa Board of Trustees meeting on August 10, 2026, has no agenda available. The agenda text states only 'No Agenda' and directs readers to review the minutes. This appears to be a procedural placeholder with no substantive items listed.

meetingprocedural
📄 From the agenda
Extracted text of the official agenda document (automated extraction — may contain OCR/formatting errors).
1. No Agenda There is no agenda available for this meeting. Please review the minutes.

Showing the 30 most recent meetings of 122 on record. See the yearly meeting archives below for the full history.

💰 Federal awards (top 10 by amount)
Largest recent federal contract/grant awards to recipients in this city (2023–present), via USAspending.gov.
$344,322SIGMA PSI CONSULTING, MECHANICAL, ELECTRICAL AND
Department of Veterans Affairs · AE SERVICES FOR THE DESIGN RENOVATE SPS PHASE 3 & 4 AT THE STRATTON VA
$131,032ZELKER ELEVATOR CO., INC.
Department of Defense · TO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR THE ELEVATOR MA
$123,392VETERANS & COMMUNITY HOUSING COALITION, INC.
Department of Veterans Affairs · OPTION 2- CONTRACT EMERGENCY RESIDENTIAL HOUSING SERVICES
$111,555RICHARD D. POSTULKA
Department of Defense · WATER TREATMENT - BULLVILLE, NY011
$80,535RICHARD D. POSTULKA
Department of Defense · TASK ORDER FOR OPTION YEAR 3 OF CONTRACT W15QKN-21-D-5031, SNOW REMOVA
$77,685VETERANS & COMMUNITY HOUSING COALITION, INC.
Department of Veterans Affairs · CONTRACT EMERGENCY RESIDENTIAL HOUSING SERVICES
$75,850RICHARD D. POSTULKA
Department of Defense · SNOW AND ICE REMOVAL SERVICES ALBANY/ROTTERDAM NY
$65,660RICHARD D. POSTULKA
Department of Defense · OY1 TO - ICE MELT AND SAND NY059
$63,368VETERANS & COMMUNITY HOUSING COALITION, INC.
Department of Veterans Affairs · CONTRACT RESIDENTIAL HOUSING SERVICES FOR HOMELESS VETERANS FOR THE AL
$56,996VETERANS & COMMUNITY HOUSING COALITION, INC.
Department of Veterans Affairs · OPTION 1 FUNDING FOR CONTRACT EMERGENCY RESIDENTIAL HOUSING SERVICES

Source: USAspending.gov (U.S. Treasury) — federal awards only, not city budgets.

🌐 County-level context (Saratoga County)
County-level context — from BLS, IRS, FEMA, HUD, Census. These figures cover the whole county this city sits in, not just the city itself.
Traffic fatalities1 (2023)
Business establishments5,488 (78,232 employees · 2023)
Fair Market Rent (2BR)$1,487/mo (215 assisted households · 2025)
Adults with low literacy10.8% (low numeracy 17% · 2017)

Sources: BLS LAUS, IRS SOI, FEMA, NHTSA FARS, Census CBP, HUD, NCES PIAAC

City profile

Everything below is drawn from this city’s own public record and primary-source government data. AI-written summaries are a finding aid, not a citable quote.

470
Health inspections
2
Permitted housing units

Services & conditions

source: city open data

Food & health inspections

On record470
Search any establishment’s inspection history.

Outcomes — economic mobility

source: Opportunity Atlas (Harvard) · research use

For kids who grew up here in low-income households, their adult household-income rank (0–1). The average hides a gap by race:

White kids
0.465
All kids
0.453
Black kids
0.407

Research-only layer, shown here for context — not included in the CC BY 4.0 bulk download.

Where it’s happening

geocoded land-use decisions
🗺 Interactive map
Every rezoning, development approval, and permit — explore the geocoded records in the research explorer.

Meeting archives

🔗 Embed this city · use the data

Free to reuse under CC BY 4.0 — a link back is appreciated. Paste this into your site:

<iframe src="https://mytown.theboringparts.com/city/villageofballstonspa.org/embed/" width="100%" height="640" loading="lazy" style="border:1px solid #ddd;border-radius:8px" title="Ballston Spa government meetings"></iframe>
<p>Local government meetings via <a href="https://mytown.theboringparts.com/city/villageofballstonspa.org/">MyTown</a></p>

The credit line under the iframe is a real link back — keep it and you help others find us (and it satisfies the CC BY attribution). Prefer JSON? meetings.json · full embed & API guide.