Campo public meetings in 2021
23 substantive meetings from 2021, with official agendas or minutes and plain-English summaries.
Executive Board
The NC Capital Area MPO Executive Board will review and potentially approve the updated 2050 Metropolitan Transportation Plan (MTP/CTP), subject to Air Quality Conformity. The board will also approve period of performance extensions for FY 2018 Wake Transit Work Plan projects. Additionally, the board will receive informational updates on the FY 2022 operating budget, member dues, and various transportation project statuses.
- Review and potential approval of the 2050 MTP/CTP projects and programs, pending Air Quality Conformity
- Approval of period of performance extensions for FY 2018 Wake Transit Work Plan project funding allocations
- Informational review of the FY 2022 Operating Budget and Q1 Budget Projections
- Informational review of Q1 Member Dues Projections for FY 2022
- Informational updates on Executive Board projects and public engagement activities
Technical Coordinating Committee
The Technical Coordinating Committee is meeting virtually to review the draft 2050 Metropolitan Transportation Plan and recommend approval of its projects to the Executive Board. The body will also consider extending the period of performance for FY 2018 Wake Transit Work Plan funding allocations. Additionally, the committee will receive informational updates on the FY 2022 operating budget and member dues projections.
- Recommend approval of 2050 Metropolitan Transportation Plan (MTP/CTP) projects and programs
- Approve period of performance extensions for FY 2018 Wake Transit Work Plan funding allocations
- Receive FY 2022 Q1 Member Dues Projection
- Receive FY 2022 Q1 Operating Budget Projection
- Review staff reports from NCDOT divisions and NC Turnpike Authority
Executive Board
The Capital Area MPO Executive Board will hold public hearings on Amendment #6 to the FY2020-2029 Transportation Improvement Program and the 2050 Metropolitan Transportation Plan update. The board will also consider consent items including the FY 2022 UPWP amendment, Wake Transit work plan amendments, transit safety targets, and a contract amendment for the Triangle Bikeway Study. An update on the federal surface transportation reauthorization bill will be received as information.
- Public hearing on Amendment #6 to FY2020-2029 Transportation Improvement Program
- Public hearing on 2050 Metropolitan Transportation Plan (MTP/CTP) update
- Adopt FY 22 UPWP Amendment #1
- Approve FY 2022 Q2 Wake Transit Work Plan amendment requests
- Approve Triangle Bikeway Study contract amendment
The Executive Board approved Amendment #6 to the FY2020-2029 Transportation Improvement Program (TIP) unanimously after a public hearing with no speakers. The board also held a public hearing on the 2050 Metropolitan Transportation Plan (MTP) update, hearing comments from several residents opposing the US 401 Bypass around Fuquay-Varina. No action was taken on the MTP; it is scheduled for draft approval on December 8, 2021. The consent agenda was approved unanimously, including the FY 2022 UPWP Amendment #1, Wake Transit Work Plan amendments, and other items.
- Approved Consent Agenda unanimously (5.1-5.5)
- Approved FY 2022 Unified Planning Work Program Amendment #1
- Approved FY 2022 Q2 Wake Transit Work Plan Amendment Requests
- Approved Public Transportation Agency Safety Performance Measures and Targets
- Approved Triangle Bikeway Contract Amendment
- Approved Amendment #6 to FY2020-2029 TIP (unanimous)
- Conducted public hearing on 2050 MTP; no action taken
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area MPO is meeting virtually to review transportation planning documents. The committee will consider recommendations for the FY2020-2029 Transportation Improvement Program Amendment #6 and the FY 2022 Unified Planning Work Program Amendment #1. Additionally, the body will review the 2050 Metropolitan Transportation Plan update and receive informational updates on the FY 2022 operating budget and project status.
- Recommend approval of Amendment #6 to FY2020-2029 Transportation Improvement Program
- Recommend adoption of FY 22 UPWP Amendment #1
- Recommend approval of FY 2022, Q2 Wake Transit Work Plan amendment requests
- Recommend adoption of transit agency safety plans performance targets
- Receive information on the 2050 Metropolitan Transportation Plan (MTP/CTP) Update
The Technical Coordinating Committee recommended approval of several transportation items to the Executive Board, including amendments to the FY2020-2029 Transportation Improvement Program, the FY 2022 Unified Planning Work Program, and nine Wake Transit Work Plan amendments. The committee also recommended final 2021 regional transit safety targets and approved using Alternative 4 financial assumptions, including a regional 1-cent sales tax equivalent, for the 2050 Metropolitan Transportation Plan. All votes were unanimous, with one member abstaining on several items.
- Recommended TIP Amendment #6 to Executive Board (unanimous, 1 abstention)
- Recommended FY 2022 UPWP Amendment #1 to Executive Board (unanimous, 1 abstention)
- Recommended 9 Wake Transit Work Plan amendments to Executive Board (unanimous, 1 abstention)
- Recommended final 2021 regional transit safety targets to Executive Board (unanimous, 1 abstention)
- Approved Alternative 4 financial assumptions for 2050 MTP, including 1-cent sales tax equivalent (unanimous)
- Approved October 2021 meeting minutes (unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board met virtually to approve several consent items, including extensions for Wake Transit work plans and amendments to the Triangle Bikeway Study. The board conducted a public hearing on the Wake Transit Art Funding Eligibility Policy and formed a working group to handle commuter rail cost-share negotiations. Additionally, the board received informational updates on the I-440 widening project and the 2050 Metropolitan Transportation Plan.
- Approval of period of performance extensions for FYs 2018 and 2019 Wake Transit Work Plan projects
- Approval of the Triangle Bikeway Study Interlocal Agreement (ILA) amendment and contract
- Public hearing and approval of the Wake Transit Art Funding Eligibility Policy
- Formation of an Executive Board Working Group for commuter rail cost-share and financing negotiations
- Informational review of Project U-2791 (I-440 Widening Project) and FY 2022 member shares
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area Metropolitan Planning Organization met virtually to discuss transportation planning updates. Key actions included recommending extensions for delayed CMAQ projects and approving period of performance extensions for FY 2018 and 2019 Wake Transit Work Plan projects. The committee also reviewed the Wake Transit Art Funding Eligibility Policy and an amendment to the Triangle Bikeway Study Interlocal Agreement. Several items, including the 2050 Metropolitan Transportation Plan update, were received for information only.
- Recommendation to extend FFY2021 authorization deadline for delayed CMAQ projects to end of FFY2022
- Recommendation to approve period of performance extensions for FY 2018 and 2019 Wake Transit Work Plan projects
- Recommendation to approve the Wake Transit Art Funding Eligibility Policy
- Recommendation to approve the Triangle Bikeway Study Interlocal Agreement amendment
- Informational review of the 2050 Metropolitan Transportation Plan (MTP/CTP) Update schedule
The Technical Coordinating Committee recommended approval of three LAPP projects to move forward after the FFY2021 deadline, an extension of the deadline for delayed CMAQ projects, and removal of those projects from submittal reductions. It also recommended approval of period of performance extensions for FYs 2018 and 2019 Wake Transit Work Plan projects, the Wake Transit Art Funding Eligibility Policy, the Triangle Bikeway ILA amendment, and TRM Protocol updates. Several items were received as information only, including the TIP Amendment #6 and the 2050 MTP update.
- Recommended approval of LAPP projects moving forward after deadline, extension for CMAQ projects, and removal from submittal reductions (unanimous)
- Recommended approval of Wake Transit Work Plan period of performance extensions and fund re-allocation (unanimous)
- Recommended approval of Wake Transit Art Funding Eligibility Policy (majority, 1 against)
- Recommended approval of Triangle Bikeway ILA amendment (unanimous)
- Recommended approval of TRM Protocol updates (unanimous)
- Approved September 2021 meeting minutes (unanimous)
Executive Board
The Capital Area MPO Executive Board is meeting virtually to receive informational updates on the Census Snapshot, NCDOT Integrated Mobility Strategic Initiatives, and the Connect 2050 Metropolitan Transportation Plan. The agenda includes public comments, approval of minutes, and no action items.
- Public comment period at start of meeting (2 minutes per speaker)
- Receive as information: Census Snapshot presentation by TJCOG
- Receive as information: NCDOT Integrated Mobility Strategic Initiatives
- Receive as information: Connect 2050 Metropolitan Transportation Plan update
The joint DCHC and CAMPO Executive Board meeting was primarily informational, with no formal votes or decisions taken. The boards received updates on the 2050 Metropolitan Transportation Plan (Connect2050), a Census demographic snapshot, and NCDOT's Integrated Mobility initiatives. Extensive public comments urged a shift away from car-centric planning toward more sustainable, multimodal transportation investments.
- Received Dec. 1, 2020 joint meeting minutes as information
- Received Census snapshot presentation as information
- Received NCDOT Integrated Mobility presentation as information
- Received Connect2050 MTP update as information
Executive Board
The NC Capital Area Metropolitan Planning Organization (CAMPO) Executive Board will meet virtually to adopt resolutions supporting the Town of Franklinton's NCDOT Bicycle and Pedestrian Planning Grant Application and 2022 Transit Asset Management performance measures. The board will also recommend endorsing the Northeast Area Study Update for use in long-range planning and consider action on the Preferred Alternative for the 2050 Metropolitan Transportation Plan (MTP/CTP) Update. Additional items include informational updates on the Wake BRT Program, CAMPO project funding, and the FY 2021 operating budget.
- Adopt Resolution of Support for the Town of Franklinton's 2021 NCDOT Bicycle and Pedestrian Planning Grant Application
- Adopt recommended 2022 Performance Measures and Targets for Transit Asset Management and State of Good Repair
- Recommend endorsement of the Northeast Area Study Update for use in the 2050 MTP
- Consider action on the Preferred Alternative for the 2050 Metropolitan Transportation Plan (MTP/CTP) Update
- Review FY 2021 Projected Budget Q4 and Member Dues Q4
The Executive Board unanimously approved the All Together scenario as the preferred alternative for the 2050 Metropolitan Transportation Plan (MTP), which assumes additional revenue to fund more extensive transit and roadway investments. The board also unanimously endorsed the Northeast Area Study Update for use in long-range planning, and approved the consent agenda items including the August minutes, a Bicycle and Pedestrian Planning Grant application, and Transit Asset Management performance measures. Several other items were received as information only, including updates on the Wake BRT program, art funding policy, and project funding status.
- Approved All Together scenario as preferred alternative for 2050 MTP (unanimous)
- Endorsed Northeast Area Study Update for use in 2050 MTP (unanimous)
- Approved consent agenda including August 2021 minutes, NCDOT Bicycle/Pedestrian grant application, and Transit Asset Management targets (unanimous)
- Received Wake BRT Program update as information
- Received Wake Transit Art Funding Eligibility Policy as information
- Received CAMPO Projects and Programs Funding Update as information
- Received Wake Transit Performance Tracker launch as information
- Received budget, member dues, project updates, and staff reports as information
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to review transportation planning updates. Key items included receiving information on the I-440 Widening Project and the Wake BRT Program. The committee also considered recommendations for the 2050 Metropolitan Transportation Plan and the Northeast Area Study Update.
- Project U-2791 - I-440 Widening Project update received as information
- Update on Implementation of Wake BRT Program of Projects received as information
- 2050 Metropolitan Transportation Plan (MTP/CTP) Update considered for recommendation to Executive Board
- Northeast Area Study Update endorsement recommended to Executive Board
- 2021 NCDOT Bicycle and Pedestrian Planning Grant Application for Town of Franklinton recommended for adoption
The Technical Coordinating Committee received updates on the I-440 widening project, Wake BRT implementation, and the 2050 Metropolitan Transportation Plan (MTP). After discussion, the committee recommended the 'All Together' scenario as the preferred alternative for the 2050 MTP, with further refinement of financial aspects expected. The committee also unanimously recommended endorsement of the Northeast Area Study Update and approval of the 2021 NCDOT Bicycle and Pedestrian Planning Grant Application for the Town of Franklinton.
- Recommended 'All Together' scenario as preferred alternative for 2050 MTP
- Recommended endorsement of Northeast Area Study Update to Executive Board (unanimous)
- Recommended approval of 2021 NCDOT Bicycle and Pedestrian Planning Grant Application for Town of Franklinton (unanimous)
- Recommended approval of Transit Asset Management Performance Measures & Targets for State of Good Repair (unanimous)
- Approved TCC August 2021 meeting minutes (unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board is meeting virtually to approve several transportation planning actions. Key decisions include adopting a resolution supporting the I-42 highway designation in Wake and Johnston Counties and approving proposed changes to the Locally Administered Projects Program (LAPP) for FFY2023. The board will also endorse the Bus on Shoulder System (BOSS) Regional Study findings and approve a financial participation agreement with the Town of Clayton for a BRT study.
- Adopt Resolution Supporting I-42 Designation in Wake and Johnston Counties
- Approve proposed changes and target modal investment mix for FFY2023 Locally Administered Projects Program (LAPP)
- Endorse findings in the Bus on Shoulder System (BOSS) Regional Study for use in MTP development
- Approve Town of Clayton Financial Participation Agreement for BRT Extensions Major Investment Study
- Approve Amendment #5 to the FY2020-2029 Transportation Improvement Program
The Executive Board unanimously approved the proposed changes and target modal investment mix for the FFY2023 Locally Administered Projects Program (LAPP), and opened the Call for Projects until October 29, 2021. The board also unanimously approved all six items on the consent agenda, including a resolution supporting the I-42 designation in Wake and Johnston counties and a financial participation agreement with the Town of Clayton for a BRT study. Staff updates on funding challenges and the 2050 Metropolitan Transportation Plan were received as information only.
- Approved LAPP FFY2023 proposed changes and target modal investment mix (unanimous)
- Opened LAPP and UPWP Call for Projects until October 29, 2021
- Approved Executive Board June 2021 meeting minutes (unanimous)
- Endorsed Bus on Shoulder System (BOSS) Regional Study findings (unanimous)
- Approved Amendment #5 to FY2020-2029 Transportation Improvement Program (unanimous)
- Approved Town of Clayton financial participation agreement for BRT Extensions Major Investment Study (unanimous)
- Adopted resolution supporting I-42 designation in Wake and Johnston counties (unanimous)
- Received Federal Certification Review as information (unanimous)
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to discuss regional transportation planning. Key actions included recommending the Executive Board endorse the Bus on Shoulder System (BOSS) Study findings and approve Amendment #5 to the FY2020-2029 Transportation Improvement Program. The committee also reviewed proposed changes to the Locally Administered Projects Program (LAPP) for FFY2023 and received updates on the 2050 Metropolitan Transportation Plan.
- Recommendation to endorse Bus on Shoulder System (BOSS) Study findings for MTP development
- Recommendation to approve Amendment #5 to the FY2020-2029 Transportation Improvement Program
- Recommendation to approve proposed changes and target modal investment mix for FFY2023 LAPP
- Informational review of the 2050 Metropolitan Transportation Plan (MTP/CTP) update schedule
- Informational review of FY 2021 Operating Budget and Member Dues Q4 projections
The Technical Coordinating Committee voted unanimously to recommend approval of the Bus on Shoulder System (BOSS) Regional Study, Amendment #5 to the FY2020-2029 Transportation Improvement Program, and the Locally Administered Projects Program (LAPP) FFY2023 Proposed Changes and Target Modal Investment Mix. The committee also received informational updates on federal funding, the 2050 Metropolitan Transportation Plan, and the Federal Certification Review. The June 2021 meeting minutes were approved unanimously.
- Approved June 2021 TCC meeting minutes (unanimous)
- Recommended BOSS Regional Study to Executive Board (unanimous)
- Recommended TIP Amendment #5 to Executive Board (unanimous)
- Recommended LAPP FFY2023 changes and modal mix to Executive Board (unanimous)
- Received funding update as information
- Received Federal Certification Review as information
- Received 2050 MTP update as information
- Received budget and project updates as information
Executive Board
The Capital Area MPO Executive Board will consider adopting the Locally Preferred Alternative for the Wake BRT Southern Corridor, approve the FY 2022 Wake Transit Work Plan, and allocate American Rescue Plan Act transit formula funds. The board will also hold public hearings on a TIP amendment and the FY2023 Locally Administered Projects Program. Several consent items cover transit financial policies, grant applications, and a mobility management study.
- Adopt Locally Preferred Alternative for Wake BRT: Southern Corridor
- Approve FY 2022 Recommended Wake Transit Work Plan
- Sub-allocation of American Rescue Plan Act transit formula funds
- Public hearing on Amendment #5 to FY2020-2029 TIP
- Approve FYs 2022/2023 Section 5310 program of projects
The CAMPO Executive Board approved the sub-allocation of $32,723,559 in American Rescue Plan Act transit formula funds to Raleigh, Cary, Wake County, and GoTriangle, including $723,094 to backfill fare revenue losses from a fare suspension through FY 2022. The board also unanimously approved the FY 2022 Recommended Wake Transit Work Plan, the Locally Preferred Alternative for the Wake BRT Southern Corridor, and a policy framework for using Wake Transit funds to acquire real property. Two public hearings were conducted on the FY2020-2029 Transportation Improvement Program Amendment #5 and the Locally Administered Projects Program FFY2023 changes, with no public speakers.
- Approved $32.7M ARP transit formula fund sub-allocation (unanimous)
- Approved FY 2022 Recommended Wake Transit Work Plan (consent agenda)
- Adopted Locally Preferred Alternative for Wake BRT Southern Corridor (consent agenda)
- Approved Wake Transit Financial Policies & Guidelines amendments (consent agenda)
- Adopted resolutions supporting Garner and Youngsville bike/ped planning grants (consent agenda)
- Approved FY22-23 Section 5310 program of projects (consent agenda)
- Authorized Executive Director to sign Mobility Management Program study funding agreement (consent agenda)
- Approved Policy Framework for Use of Wake Transit Funds to Acquire Real Property (unanimous)
Technical Coordinating Committee
The Technical Coordinating Committee will vote on recommendations to the Executive Board, including sub-allocating American Rescue Plan Act transit formula funds, adopting a Locally Preferred Alternative for the Wake BRT Southern Corridor, and approving the FY 2022 Wake Transit Work Plan. The committee will also consider policy frameworks for using transit funds to acquire real property and amendments to financial policies. Several items are for information only, such as the Bus on Shoulder study report and the 2050 Metropolitan Transportation Plan update.
- Sub-allocation of American Rescue Plan Act transit formula funds (amounts in attached split letter)
- Adoption of Locally Preferred Alternative for Wake BRT: Southern Corridor
- Policy Framework for Use of Wake Transit Funds to Acquire Real Property
- FY 2022 Recommended Wake Transit Work Plan
- 2021 NCDOT Bicycle and Pedestrian Planning Grant Applications
The Technical Coordinating Committee recommended approval of the Locally Preferred Alternative for the Wake BRT Southern Corridor, pending no adverse public comment. The committee also recommended approval of the FY 2022 Wake Transit Work Plan, a policy framework for real property acquisition, and amendments to transit financial policies. All votes were unanimous.
- Recommended adoption of Wake BRT Southern Corridor LPA (unanimous)
- Recommended approval of FY 2022 Wake Transit Work Plan (unanimous)
- Recommended approval of Policy Framework for Wake Transit real property acquisition (unanimous)
- Recommended approval of Wake Transit Financial Policies & Guidelines amendments (unanimous)
- Recommended approval of 2021 NCDOT Bicycle and Pedestrian Planning Grant applications (unanimous)
- Recommended approval of ARP transit formula fund sub-allocation (unanimous)
- Recommended approval of FY22-23 Section 5310 program of projects (unanimous)
- Approved May 2021 meeting minutes (unanimous)
Executive Board
The Capital Area MPO Executive Board will hold public hearings on the FY 2022 Wake Transit Work Plan, the Locally Preferred Alternative for the Wake Bus Rapid Transit Southern Corridor, and the Section 5310 program for senior and disabled mobility. The board will also consider consent items including meeting minutes, an ITS strategic plan, transit safety targets, and Wake Transit work plan amendments. Informational updates will cover the Complete 540 project, the 2050 Metropolitan Transportation Plan, and budget status.
- Public hearing on FYs 2022-2023 Section 5310 Enhanced Mobility project selection
- Public hearing on FY 2022 Recommended Wake Transit Work Plan
- Public hearing on Locally Preferred Alternative for Wake BRT Southern Corridor
- Approve FY 2021 4th Quarter Wake Transit Work Plan Amendment Requests (with exception for TC005-A1)
- Adopt 2020 Public Transportation Agency Safety Plan performance targets
The CAMPO Executive Board approved the consent agenda, which included endorsing recommendations for the 2050 Metropolitan Transportation Plan, adopting initial transit safety performance targets, and approving FY 2021 Q4 Wake Transit Work Plan amendments (with an exception for project TC005-A1). The board also conducted public hearings on the Section 5310 program, the FY 2022 Wake Transit Work Plan, and the Wake BRT Southern Corridor Locally Preferred Alternative, but took no action on these items. Several informational updates were received, including on Complete 540, the Mobility Coordination Committee, and the 2050 MTP update.
- Approved consent agenda items unanimously (20-0)
- Endorsed recommendations for 2050 MTP development
- Adopted initial transit safety performance targets
- Approved FY 2021 Q4 Wake Transit Work Plan amendments (except TC005-A1)
- Conducted public hearing on Section 5310 program
- Conducted public hearing on FY 2022 Wake Transit Work Plan
- Conducted public hearing on Wake BRT Southern Corridor LPA
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area Metropolitan Planning Organization meets virtually to review transportation planning documents. Key actions include recommending approval for FY 2021 Wake Transit Work Plan amendments and adopting initial public transportation safety performance targets. The committee also receives informational updates on the Wake BRT Southern Corridor Locally Preferred Alternative and the 2050 Metropolitan Transportation Plan schedule.
- Recommendation to approve FY 2021, 4th Quarter Wake Transit Work Plan Amendment Requests, with an exception for project TC005-A1
- Recommendation to adopt initial 2020 Public Transportation Agency Safety Plan performance measure targets
- Informational update on the Locally Preferred Alternative for Wake BRT: Southern Corridor
- Informational update on the FY 2022 Recommended Wake Transit Work Plan
- Informational update on the 2050 Metropolitan Transportation Plan (MTP/CTP) schedule
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board is meeting virtually to approve Amendment #4 to the FY2020-2029 Transportation Improvement Program. The board will vote to adopt the Wake County Transit Plan Update and approve a support policy for Member Designated Project Funding. Additionally, the board will approve a recommended approach for distributing COVID-19 funding relief.
- Adoption of the Wake County Transit Plan Update
- Approval of Amendment #4 to the FY2020-2029 Transportation Improvement Program
- Approval of the Member Designated Project Funding (Earmark Funding) Support Policy
- Approval of the recommended COVID-19 Funding Relief Approach
- Review of the FY 2021 Operating Budget Q3 projections
The Executive Board unanimously adopted the Wake County Transit Plan Update, which outlines transit investments for the county. The board also approved a policy for supporting member-designated federal projects, contingent on new funding, and approved using $5.9 million in COVID relief funds to replenish local project balances rather than program new projects. Several informational reports were received, including updates on connected vehicle technology and the regional intelligent transportation systems plan.
- Adopted Wake County Transit Plan Update (unanimous)
- Approved Member Designated Project Funding Support Policy (unanimous)
- Approved COVID-19 Funding Relief Approach to use $5.9M to replenish LAPP balances (unanimous)
- Approved Consent Agenda including March 2021 minutes and TIP Amendment #4 (unanimous)
- Received NCDOT Multimodal Connected Vehicle Pilot Project as information
- Received Triangle Region ITS Strategic Deployment Plan as information
- Received 2050 Metropolitan Transportation Plan update as information
- Received budget, member shares, project updates, and staff reports as information
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area Metropolitan Planning Organization is meeting virtually to review transportation planning updates. Key decisions include adopting the Wake County Transit Plan Update and recommending approval of Amendment #4 to the FY2020-2029 Transportation Improvement Program. The committee will also discuss the Member Project Funding Designation Support Policy and receive informational updates on the 2050 Metropolitan Transportation Plan and FY 2021 budget status.
- Adoption of the Wake County Transit Plan Update
- Recommendation of approval for Amendment #4 to the FY2020-2029 Transportation Improvement Program
- Discussion of the Member Project Funding Designation (Earmark Funding) Support Policy
- Informational review of the NCDOT Multimodal Connected Vehicle Pilot Project
- Informational update on the 2050 Metropolitan Transportation Plan (MTP/CTP) schedule
The Technical Coordinating Committee recommended adoption of the Wake County Transit Plan Update to the Executive Board by unanimous vote. The committee also approved a policy for supporting member-designated project funding (earmarks), recommended Amendment #4 to the FY2020-2029 Transportation Improvement Program, and voted to use $5.9 million in COVID relief funds to replenish LAPP balances rather than program new projects. Several informational reports were received, including updates on connected vehicle technology and the regional ITS deployment plan.
- Recommended adoption of Wake County Transit Plan Update to Executive Board (unanimous)
- Recommended Member Project Funding Designation Support Policy to Executive Board (unanimous, 1 abstention)
- Recommended approval of Amendment #4 to FY2020-2029 TIP (unanimous)
- Recommended using $5.9M COVID relief funds to replenish LAPP balances, not program new projects (unanimous, 1 abstention)
- Approved March 2021 TCC meeting minutes (unanimous)
Executive Board
The Capital Area MPO Executive Board will hold a public hearing on the Wake County Transit Plan Update and consider approving a contract for a Bus Rapid Transit Extensions study. The board will also vote on consent items including a CMAQ funding endorsement, the FY 22 Unified Planning Work Program, and federal transit fund allocations. The meeting is virtual due to COVID-19.
- Public hearing on Wake County Transit Plan Update
- Public hearing on Amendment #4 to FFY2020-2029 Transportation Improvement Program
- Contract approval for Bus Rapid Transit Extensions Major Investment Study
- Resolution to endorse statewide CMAQ funding application
- Adoption of FY 22 Unified Planning Work Program and MPO Self-Certification
Technical Coordinating Committee
The Technical Coordinating Committee is reviewing the Unified Planning Work Program (UPWP) for FY 22 and the distribution of FFY 2021 Federal Transit Administration formula grants. The committee will recommend that the Executive Board adopt the FY 22 UPWP and approve the sub-allocation of funds for Sections 5307, 5340, 5339, and CRRSAA. Additional items include a preliminary deficiency analysis for the 2050 Metropolitan Transportation Plan and updates on the Wake County Transit Plan.
- Recommendation to adopt the FY 22 Unified Planning Work Program (UPWP) and MPO Self-Certification
- Recommendation to approve sub-allocation of FFY 2021 FTA funds for Sections 5307, 5340, 5339, and CRRSAA
- Review of preliminary Deficiency Analysis results for the DRAFT 2050 MTP
- Informational review of the FY 2022 Draft Wake Transit Work Plan
- Informational review of the Wake County Transit Plan Update - Final Plan Document
Executive Board
The NC Capital Area MPO Executive Board is meeting virtually to approve the Locally Preferred Alternative for the Downtown Cary Transit Center and the FY22 Locally Administered Projects Program (LAPP). The board will also conduct a public hearing on the FY22 Unified Planning Work Program and review safety performance targets. Several other items, including the Northeast Area Study Update and budget reports, are for informational purposes only.
- Approve Locally Preferred Alternative for Downtown Cary Transit Center
- Approve FFY22 Locally Administered Projects Program (LAPP) Investment Program
- Public Hearing on Unified Planning Work Program (UPWP) and MPO Self-Certification - FY 22
- Adopt FY 21 Unified Planning Work Program - Amendment #2
- Review safety performance targets and agree to plan projects contributing to State targets
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to review transportation planning items. The committee recommended that the Executive Board approve the FFY22 Locally Administered Projects Program (LAPP) Investment Program and the Locally Preferred Alternative for the Downtown Cary Transit Center. They also reviewed safety performance targets for FY21 and Amendment #2 to the FY 21 Unified Planning Work Program.
- Recommendation to approve the FFY22 Locally Administered Projects Program (LAPP) Investment Program
- Recommendation to approve the Locally Preferred Alternative for the Downtown Cary Transit Center
- Review of Safety Performance Measures and Targets for FY21
- Recommendation to adopt FY 21 Unified Planning Work Program - Amendment #2
- Informational review of the FY 2021 Operating Budget and Member Shares
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to conduct public hearings on the Locally Administered Projects Program (LAPP) and the Downtown Cary Transit Center. The board also votes on the 2021 Chair and Vice Chair, reviews the FY 2021 operating budget, and considers amendments to the Wake Transit Work Plan. This body coordinates transportation planning for Wake County and portions of Franklin, Granville, Johnston, and Harnett counties.
- Public hearing on the Recommended FFY22 LAPP Investment Program
- Public hearing on the Locally Preferred Alternative for Downtown Cary Transit Center
- Election of the 2021 Executive Board Chair and Vice Chair
- Approval of FY 2021 Q2/Q3 Wake Transit Work Plan Amendments
- Approval of Town of Apex additional funding request and LAPP funding restart approach
Technical Coordinating Committee
The Technical Coordinating Committee will elect its 2021 Chair and Vice Chair, consider approving FY 2021 Q2/Q3 Wake Transit Work Plan amendments, and act on a funding request from the Town of Apex. The committee will also receive updates on several transportation planning efforts, including the 2050 Metropolitan Transportation Plan and the Wake Transit Vision Plan. Public comments are accepted at the start of the meeting.
- Election of Chair and Vice Chair for 2021
- FY 2021 Q2/Q3 Wake Transit Work Plan Amendments – recommendation to Executive Board
- Town of Apex additional funding request under CAMPO Projects and Programs
- Restart of Locally Administered Projects Program (LAPP) funding using first-in, first-out approach
- FY 2021 operating budget and member dues projected figures